360 32 web2

33-35 Monier Road

33-35 Monier Road is a mixed-use, new build development that lies within one of the key zones for post-Olympic regeneration in east London.

READ MORE...
Dixons2

Dixons McMillan Academy

The Dixons Academies Trust chose the former Bradford College site to be the location for their 4th Free School, the Dixons McMillan Academy.

READ MORE...
Front Entrance Champagne

Rydens Enterprise School & Sixth Form College

Rydens Enterprise School & Sixth Form College undertook a huge redevelopment of their site to create a state-of-the-art facility to deliver 21st Century education, consisting of seven buildings. TDS Midlands were on hand to design & detail the complexed 385 tonne steelwork frame.

READ MORE...
Annex Building 11 e1431491203229

Logie Point, Jersey

A mixture of structural and architectural steelwork was required to form a complex roof structure for Logie Point, a private residence in Jersey. Having previously completed a similar, but smaller and less intricate, roof for an annex to the property, this was phase two of our client’s involvement in the project.

READ MORE...
UOL 1

33 Finsbury Square, University of Liverpool

Working in collaboration with Smok Architects, Overbury and Barwest Fabrications, TDS were appointed to design, develop and detail two feature staircases on this fantastic project which set out to revitalize a landmark building and create a new world class higher education establishment in the heart of London.

READ MORE...
Walkie Talkie 2

20 Fenchurch Street, London, ‘The Walkie Talkie’

TDS were proud to work on this iconic building that dominates the London Skyline. Initially engaged by PAD Contracts to design, develop and detail a series of hanging access platforms within the roof structure, we were also later engaged to work on the east and west stair handrails within the impressive Sky Garden which overlooks the city.

READ MORE...
ord arch 2 opt

Salford Arch

TDS working in collaboration with Swann Group were successful in winning the Salford Arch advertising structure project – the first purpose built digital advertising arch in Britain. A complex engineering project – an 18m high arch spanning 38m across the M602 with 200m2 of advertising space, we provided the initial conceptual drawings along with a full design and manufacturing package to enable the accurate fabrication and installation of this iconic structure which is seen by more than 80,000 people a day.

READ MORE...
Dixon Poon

University of Oxford China Centre

The University of Oxford has been regarded as Europe’s leading centre for the study of China for some time. TDS were delighted to work on this beautiful building which was a Civic Trust Awards - Regional 2016 Finalist. TDS designed, developed and detailed the architectural metalwork for this project including the stunning lift shaft with wrap around feature helical staircase.

READ MORE...
Green Park House

Bath Spa University, Green Park House

TDS were delighted to work in conjunction with Elements Europe, Berkley Homes and Stride Treglown Architects to deliver 461 room pods for a new student accommodation scheme in the heart of the historic spa city of Bath. The volumetric system consisted of a mixture of both cold rolled and hot rolled steel structures and enabled the project to benefit from offsite construction ensuring the project was delivered on time and in budget.

READ MORE...
Chiswick Park 2 opt

Building 7, Chiswick Park, London

Chiswick Park was TDS’ first fully integrated BIM construction project working in conjunction with PAD Contracts, Stanhope and Lend Lease. TDS designed, developed and modelled 3 external escape stairs and an internal staircase consisting of 108 flights in total. In addition we were also engaged to provide all of the room perimeter balustrades. One of the key benefits to this project was the ability to collaborate by exporting and then integrating our models into a master project model that highlighted any potential clashes or design discrepancies. All BIM work was compliant to LOD400 (American based CASE ran the BIM requirements for the project).

READ MORE...